During the Second World War, London was in a state of crisis after large portions of the city were demolished by German war planes. In response to this, many high rise apartments were constructed in order to take people off the streets and out of the slums and give them a basic means for living again.

Around the same time, there had been huge cutbacks in the amount of skilled construction workers as the large majority of them were opting for easier and safer jobs on factory floors around the country. Also at this time, a national policy change allowed the density of occupancy to double from seventy to one hundred forty persons to the acre. This all conveniently coincided with the development of prefabricated construction techniques and sparked the assembly of high rise apartment buildings all over the city of London. This new style of housing could accommodate large numbers of people, save land and labor, and was reasonably quick to construct.

Fig ? Ronan Point after Collapse (Courtesy of ???)The method utilized for this high rise apartment was the Larsen-Neilsen system. This system was first initiated by Larsen Nielson in Denmark in 1948 in order to reduce the amount of construction work required to be undertaken on-site. In this system, components such as walls, staircases and floors are prefabricated. All of these elements are load bearing, meaning they provide support for the elements which lie directly above. In the case of Ronan Point, which was the second of six similar sister towers constructed in the London area after the war, each floor section was supported solely by the load bearing wall beneath it. Gravity load transfer occurred only through these load-bearing walls. These external and internal walls and floors formed by large panels, approximately 150-175mm thick, of steel reinforced precast concrete. These floor and wall elements were slotted together, bolted and then filled with cement to secure the connection.

Get Help With Your Essay

If you need assistance with writing your essay, our professional essay writing service is here to help!
Find out more about our Essay Writing Service

The construction of Ronan Point, which was located in the West Ham area of East-London, began on 15th July 1966. Construction of the project was undertaken and fully completed inside two years and at the time it cost approximately £500,000 to build. When fully assembled, Ronan Point measured in at 80ft by 60ft in area and 210ft in height. It was twenty-two stories tall with a total of 110 apartment units housed in the building (five per floor). It was made up of 44 2-bedroom flats and 66 1-bedroom flats. Tenants began flooding out of the slums in West Ham and into their new "homes in the sky". The building was occupied for less than three months before the explosion, leading to failure occurred.

2 Collapse

On the 16th of May 1968, at approximately 05:45, the southwest corner of Ronan Point Tower completely collapsed. The explosion occurs in Flat 90, which was located on the 18th floor, situated on the south-east corner if the tower. The explosion blew out complete sections of the outer wall, resulting in a type of domino style collapse of the wall and floor sections, right from the top of the buildings as far as the ground floor. The partial collapse of Ronan Tower claimed the lives of four people and injured a further seventeen but the death toll could have been so much higher.

Due to the timing of the disaster, luckily all other residents apart from one were sleeping in their bedrooms. Another stroke of luck was that, in the entire tower, only three apartments still remained unoccupied and these apartments were all contained in the south-east corner of the tower. Only one apartment which was situated directly above the explosion was occupied.

Figure 6. Close-up of collapse courtesy of (Bignell 1977).

Floor 18;

Apartment 90One lucky survivor, unable to sleep, had risen quietly leaving her husband in bed and was laying on a couch in her living room when the outer wall collapsed inwards and she was forced to the doorway as the floor disappeared leaving her on a narrow ledge unable to get through the door now jammed by rubble. Her husband reached through the opening and managed to grab and hold his wife with one arm while desperately clearing the rubble from the door with the other, he succeeded in bringing her to safety quite badly injured but alive.

The initial explosion in Flat 90 was caused by a gas-stove leak, and was sparked off by the occupier of the flat striking a match in order to brew her morning cup of tea. The force of the resulting explosion caused the woman to be flung to the other side of the room and knocked unconscious but miraculously she escaped without any further injuries.

The force of the explosion knocked out the opposite corner walls of the apartment. These walls were the sole support for the walls directly above. This created a chain reaction in which floor nineteen collapsed, then floor twenty and so on. Four floors fell onto level eighteen, which initiated a second phase of progressive collapse. This sudden loading on floor eighteen caused it to give way, smashing floor seventeen and progressing until it reached the ground

The collapse sheared off only the living room portion of the apartments, leaving the bedrooms intact with the exception of floors seventeen through twenty-two, where all the fatalities occurred. The explosion blew out the internal walls of the flat and also, unfortunately, the load-bearing external flank walls of the living room and bedroom, which left the floor above unsupported and this collapsed.

3 Failure Hypothesis

It was initially understood that Ronan Point had collapsed due to a gas explosion in the 18th floor due to the fact that a substandard brass nut which connected the hose to the stove failed.

4 Investigation & Cause of Failure

Shortly after the explosion, and partially due to pressure from the general public, the government formed a panel to investigate into the cause of the collapse. The panel quickly determined that the gas leak which caused the explosion was responsible for the initial collapse of the building. Further investigation showed that a substandard brass nut had been used to connect the hose to the stove. The nuts flange was thinner than the required standard and also had an unusual degree of chamfer. When this nut failed it lead to the gas flowing at an estimated rate of 120 ft cubed and hour through open doors and accumulate in the flat. Tests were carried out on a replica nut of same dimensions in order to determine how much force was required to break it in tension.

The findings of these tests showed that a force of 15.6 kN or 3,500 pounds, was all that was required to break the connections. It was also found that the hose connecting the stove to the gas would have actually failed before the nut at a force of 1.6 kN or 360 pounds. Prior to this investigation, it was commonly assumed that the nut had been fractured previous to the explosion due to over-tightening during instillation. It was believed that this over-tightening may have caused the nut too break which would have lead to gas leaking into the apartment.

It is thought that the gas may have rose over night and accumulated at the ceiling, which would explain why the resident did not smell it that morning. In terms of magnitude, it was not a very colossal explosion. The resident, who was flung across her kitchen, did not suffer any damage to her hearing which would suggest that the pressure of the explosion was less than 70 kPa. It was also proven, by testing items taken from the kitchen of this apartment, that these items were not subjected to pressure over 70 kPa.

A variety of different tests were carried out by The Building Research Station & Imperial College of London in order to determine how much internal force the building could withstand. These results indicated that the walls could have been displaced by a pressure of only 19.3 kPa (Levy 1992). It was also estimated that the kitchen and living room walls were moved at a pressure of only 1.7 kPa, while the exterior wall was moved at a gas pressure of 21 kPa (Griffiths et al., 1968).

5 Technical Aspects

Subsequent to these investigations carried out by the government's assigned panel of experts, it was revealed that failure on Ronan Point may have occurred in a number of different ways. It was found that both strong gale winds and/or the effects of a fire on the building could have resulted in a progressive collapse. The building was only designed to withstand wind velocities of a mere 100 kph. It is more than likely, that the building would have been subjected to wind speeds of up to 170 kph, 200 ft above ground level, within the buildings life expectancy of sixty years.

More findings on the Ronan Point tower collapse told that, the building codes which were used for the design of Ronan Point as well as its sister apartments were not up to scratch and had not been kept up to date. Relevant knowledge was available at that time from the National Physical Laboratory stating that "Higher than stated winds were known to occur in that area". It was noted that, "…the structure had been designed to comply with fifteen year old wind load codes that did not take into account current building heights (Britain 1970)." According to the inquiry, "the suction effect of the pressures applied by such winds in particular the opening of the joints as the tower block bent in the wind, would have similar effect to the explosion." 

It was also found that if a fire had ignited in the tower, that the structure would have suffered a similar effect. The inquiry stated, "it is estimated that fire could so expand and 'arch' the floor slab and bend the wall panel, as to displace or rotate an H-2 joint to a dangerous degree." (Wearne, 2000).

A fire test on the building had in fact been conducted by the request of the architect Sam Webber sixteen years prior to the collapse. The results of this test verified that the buildings elements would almost have certainly have failed under the impact of fire. Webb also predicted that after approximately sixteen years the tower would develop serious structural problems, especially with the joint connections.

Another major flaw in the building's design was that there were sizeable gaps in the connections between the walls and floors through which smoke could easily pass. As well as this, these gaps would have also enabled sounds such as television sets and conversations to pass between the floors.

Webb performed some simple tests in some of the Ronan Point apartments. According to Webb, "One of the simplest tests was to get a sheet of paper, tear a strip off, put it against the skirting board, and let it go at one end.  The loose end was coming out at ceiling level in the apartment below.  Another basic test was to put a coin up against the wall and let it go.  It fell through the gap as if going into a slot machine." (Wearne, 2000).

Webb was requested by the chair of Newham's Housing Committee to carry out a variety of test in order to fully gauge the condition of Ronan Point. He compiled an investigation team and together they surveyed and carried out tests on over half of the towers apartments. Their findings revealed cracks in the central stairwell and elevator shaft, which indicated movement throughout the building. After these cracks had been analyzed it was confirmed that Ronan Tower block was moving quite dramatically in conditions of high winds. As a result of this the building was slowly being broken apart. The building was on its lifting bolts and was held up by the 'blast angles' fitted after the public inquiry. It was found that the drypack mortar which was used had either been crushed, or had never even been used in the first place.

With all these negative test results, as well as growing concerns form Ronan Tower residents over the building's structural integrity, it was almost inevitable that the building would be required to be demolished. This came to pass in May 1986 when the controversial tower block was evacuated and taken apart. This building, which had a life expectancy of sixty years, served just eighteen of these years. The building was not tore to the ground as is often the method of demolition for these high rose apartments. In order to prove Webb's theories of poor workmanship in the towers construction, it was ordered that Ronan Point tower block be dismantled floor by floor in order for a variety of experiments and testing to be performed on its joints. These tests quickly verified Webb's suspicions of poor workman ship.

However, not even Webb himself could believe the extent of the shoddy workmanship. Latter to these experiments a shocked Webb commented, "I knew we were going to find bad workmanship - what surprised me was the sheer scale of it.  Not a single joint was correct.  Fixing straps were unattached: leveling nuts were not wound down, causing a significant loading to be transmitted via the bolts: panels were placed on bolts instead of mortar.  But the biggest shock of all was the crucial H-2 load-bearing joints between floor and wall panels.  Some of the joints had less than fifty percent of the mortar specified." (Wearne, 2000)

4 Professional and Procedural Concerns

Subsequent to the findings of Webb and his team of young architects, which displayed just how badly the workmanship at Ronan Point was flawed, it was almost immediately ordered that all remaining towers which were built under the Larsen-Nielson system be demolished. During the era of these towers construction, there were no building codes or strict regulations to govern over the types of issues that made this system of building so deeply flawed.

Large concrete panel construction was the height of innovation at this time, and little was known about how it would perform.  The building regulations in effect at the time contained a 'catch all' clause known as the 'functional requirement on structure'.  This clause contained no mention of redundancy or progressive collapse (Bignell 1977).

The collapse or the southeast corner of Ronan Point tower brought about some much needed changes to the existing regulation codes at the time. The possibility of progressive collapse is now largely taken into consideration in the building codes when construction a high rise building. The codes also require minimum amounts of ductility and redundancy. As a result of this, in 1970, the "Fifth Amendment" of the English building regulations was developed.

According to Arnold W. Hendry, it "applies to all buildings over four stories and requires that under specified loading conditions a structure must remain stable with a reduced safety factor in the event of a defined structural member or portion thereof being removed.  Limits of damage are laid down and if these would be exceeded by the removal of a particular member, that member must be designed to resist a pressure of 34 kN/m² (51 lb/in²) from any direction.  Of special importance in relation to load bearing wall structures is that these conditions should be met in the event of a wall or section of a wall being removed, subject to a maximum length of 2.25 times the story height." (Hendry, 1978).

Massive lessons were learned after the collapse of Ronan Point, and in many ways the industry probably needed a disaster of this magnitude to expose how radically the building codes needed to be amended. Britain proceeded to conduct research into the subject of progressive collapse and was followed shortly by the United States who implemented their own new design criteria.

The British government put a mandate in place which would aid against the failure known as progressive collapse. The main component of these guidelines was a necessity to include a failsafe mechanism is all such large panel buildings. Floor and wall connections would be required to be bound with steel bracing and contain a minimum tensile strength of 21 MPa (3000 psi) across the length and width of the roofs and floors.

Guidelines against progressive were also drawn up by The Portland Cement Association and the Pre-stressed Concrete Institute. These regulations also proposed that by tying building elements together, it would increase the buildings ductility therefore better sustaining the building elements deformations, following the failure of a portion of the buildings structure. Transverse ties create cantilever action from adjacent walls.  Vertical ties provide suspension from panels above, peripheral ties hold floors together, and longitudinal ties string floor planks-large prestressed panels-together" (Ross 1984).

The engineering profession was reminded of the need for redundancy in design to prevent a progressive collapse.  It is of utmost importance that building designs contain some measure of continuity (Shepherd and Frost, 1995). 

After extensive research into the subject, engineers and architects in the UK were provided with data for load bearing walls. The Larsen - Nielson system was not initially developed to be utilized in the construction of buildings more than six floors in height. But somehow in the UK this system was used to build these tall structures.

The inquiry concluded that the codes governing construction and design methods needed immediate reevaluation. It was included in the report that under no circumstance of imagination was Ronan Point considered to be any ways near an acceptable building to be occupied. And yet the building was designed and constructed in compliance with the Newham by-laws, which was the Building Regulations in operation at the time.

This is so manifestly an unsatisfactory state of affairs that it is necessary to enquire how it came about and to consider remedies for the future" (Griffiths et al., 1968).

After dismantling Ronan Point, the concept of quality control was really called into question. Although it was immediately recognized that it was the design of Ronan Point that primarily lead to the buildings collapse, it must also be noted that due to poor construction quality in the tower it is almost certain that there would have been future problems with the buildings structural integrity. At the time there was very little or no efforts to ensuring effective quality control methods were enforced in the construction process.

According to Feld and Carper (1997),  "As with all other construction materials, the best designs in precast and prestressed concrete can be ineffective unless the work done in the field is of high quality.  If the design is marginal, construction deficiencies can compound the errors increasing the potential for serious problems…"  "Skilled supervisors who understand the design intent and can communicate it clearly to the field workers are needed full-time at the construction site while all prestressed concrete work is erected."  (Feld and Carper, 1997).

5 Ethical Concerns

Initially, substandard workmanship had been detected prior to the collapse of Ronan Point. Even though it was later determined that this was completely negligible as to how the south-west corner of the tower collapsed, this information was not made public at the time which brought about a whole range of ethical and political concerns.

The government felt compelled to keep its promise on getting people out of the slums and providing affordable housing in the city. As a result of this, the findings on the substandard workmanship on Ronan Point were not published until 1968. By this time, many large panel concrete building had already been completely constructed under the Larsen-Nielson system. It was never a factor in the governments thinking that these building could ever be demolished. This is largely due to the fact that six of these types of buildings had already been completed and to demolish them would have been detrimental on the nation's economy. There was not even enough money to carry out works on these towers to make them more structurally safe.

Sam Webb done all in his powers to make people aware of the potential hazards associated with these new tower-blocks. He informed officials how these building could easily surcome to a progressive collapse in the event of fire or high wind speeds. He strongly advised for the demolition of these towers before they took the lives of unsuspecting occupants.

6 Conclusion

The collapse of Ronan Point revealed the vulnerability of the Larsen-Neilsen system of construction. Post-accident enquiries proved that the large panel construction system, in which panels of prefabricated concrete formed the walls, floors and roof slabs, was particularly vulnerable to progressive collapse due to gas explosion or other accidental damage. The incident revealed a fundamental error in the design concept.

Testing carried out on Ronan Points structural elements prior to the collapse proved that the tower would almost certainly have failed, even is the gas explosion in question had never taken place. Substandard gas nuts had been used, the hose connections were flawed, and the load bearing walls were unable to withstand relatively low pressures. As it was a relatively small explosion which led to the progressive collapse of the structure it had to be concluded that Ronan Point collapsed due to its lack of structural redundancy. There was no fail-safe mechanism designed into the building, and no alternative load paths for the upper floors should a lower level give way. Due to the absence of any type of structural frame, the upper floors had zero support and fell onto floor seventeen. The panels which formed floor seventeen could not support the sudden weight load of these five upper floors and consequently gave way. This collapse was repeated on every floor until it finally reached ground level.

The entire south east corner of the building was torn to the ground. It was subsequently rebuilt as a separate section and joined to the existing building by walkways. Gas was banned from Ronan Point and the building was reinforced with blast angles.

Even though it is quite clear that Ronan Point Tower collapsed due to a lack of structural redundancy it is also understood how difficult it would have been to build in more improved redundancy into this type of structure. Improving local resistance by installing higher strength precast concrete wall panels, which had been blown out to cause the initial collapse, would not have prevented the disaster. Testing proved that these walls would have blown out regardless of their strength.

Better interconnection of structural components would have been the key for the survival of Ronan Point Tower-block. Stronger and more positive connections between the wall panels and the floors, with less reliance on friction due to weight to hold everything together, is likely to have greatly reduced the scale of the collapse of the Ronan Point building.

7 Recommendations

From our investigations, it seems that Ronan Point Tower was destined for failure from day one. Since the progressive collapse of this structure, many codes and standards have attempted to address the issue of this type of collapse. It is now general practice that all the building elements be tied together and the ductility increased so building elements may withstand deformations from the failure of a portion of the building's structure.

However, before the initiation of these new building regulations there could have been a method utilized in Ronan Point's construction that may have saved the structure from progressive collapse.

J. Perf. Constr. Fac.. (May 2005). Ronan Point Apartment Tower Collapse and its Effect on Building Codes. Journal of Performance of Constructed Facilities. 19 (1), 172-177.

Rouse and Delatte, Lessons from the Progressive Collapse of the Ronan Point Apartment Tower, Proceedings of the 3rd ASCE Forensics Congress, October 19 - 21, 2003, San Diego, California

http://matdl.org/failurecases/Building%20Cases/Ronan%20Point.htm

Griffiths, Hugh; Pugsley, A. G.; Saunders, Owen, (1968).  Report of the Inquiry into the Collapse of Flats at Ronan Point, CanningTown.   Her Majesty's Stationery Office, London.

Britain.  (1970).  "Britain tightens building standards, moves to stern 'progressive collapse.'"  Engineering News-Record.  April 16, 1970, 12.

Bignell, Victor; Peters, Jeoff; Pym,Christopher. (1977). Catastrophic Failures. Open University Press, Milton Keynes, New York.

Cook, Lal. (1997). Ronan Point. Available: http://www.lalamy.demon.co.uk/ronanpnt.htm. Last accessed 20 Jan 2010.

Feld, Jacob and Carper, Kenneth (1997). Construction Failure. John Wiley and Sons, Inc., USA.

Masayuki Nakao. (????), Chain Reaction Collapse of a High Rise Apartment due to a Gas Explosion, Available: http://shippai.jst.go.jp/en/Detail?fn=2&id=CA1000634, Last accessed 18/02/10.

Yataro Hatamura. 2003, Applying Lessons Learned from Failures, Kodansha Ltd.

CASE STUDY - L'AMBIANCE PLAZA

1 Background

The collapse of L'Ambiance Plaza is said to be the most colossal disaster in modern Connecticut history. The collapse, which occurred on 23rd April, 1987, was responsible for claiming the lives of 28 construction workers. At this stage, the proposed structure was only a partially erect steel frame. It was proposed that L'Ambiance Plaza was to be a 16-story building, housing 13 apartment levels, with three parking levels underlying these apartments. Just prior to the collapse, the structure was comprised of two offset rectangular towers, each 63 ft by 112 ft in diameter, which were connected by an elevator shaft. The buildings structural frame was comprised of 178mm thick post tensioned, concrete slabs and steel columns. Post tensioning overcomes the tensile weakness of concrete slabs by placing high strength steel wires along their length or width before the concrete is poured. After the concrete hardens, hydraulic jacks pull and anchor the wires compressing the concrete (Levy and Salvadori, 1992).

Fig.?? Floor Plan of L'Ambiance Plaza (Moncarz Et Al. 1992)

Initially, at least six failure hypothesis theories were established. However, due to a prompt legal settlement these investigations were kept from being completed. It is important that was discuss and analyze all of these original hypothesis theories as well as the leading theory, where the finger of blame for the failure is pointed at the lift-slab construction method.

This method of slab placement was patented in 1948 by Youtz and Slick and was utilized in the construction of L'Ambiance Plaza. Each of the sixteen floor slabs which the building was to be composed of were all constructed at ground level and placed on top of each other using bonds breakers. Slabs packages of about two or three were then elevated into temporary positions using the hydraulic lifting apparatus and fixed using steel wedges. This process was carried out using a hydraulic jack on top of each column and a pair of lifting rods extending down to lifting collars cast in the slab. Slabs were then permanently attached to the steel columns. Lateral restraint for the top two floors were to be provided by two shear walls, one situated in each tower. These two floors depended on the rigid joints between the steel columns and the concrete slabs for their stability. Because the shear wall played such an indispensable role in the lateral stability of the building, the structural drawings specified that during construction the shear walls should be within three floors of the lifted slabs (Heger, 1991).

This accident prompted a major nationwide federal investigation into this construction technique as well as a temporary moratorium of its use in Connecticut.

At the time of collapse, the building was a little more than halfway completed. In the west tower, the ninth, tenth, and eleventh floor slab package was parked in stage IV directly under the twelfth floor and roof package. The shear walls were about five levels below the lifted slabs (Cuoco, 1992).

2 Collapse

The collapse of L'Ambiance Plaza occurred while the building was still under construction. It was little over halfway through its construction process meaning there was heavily occupied by construction workers on the day of the collapse. The ninth, tenth, and eleventh floor slab package were being stored in stage IV of the west tower, directly under the twelfth floor and roof package. This layout can be observed in fig. ??. The shear walls were located about five levels below the lifted slabs. Workmen were tack welding temporary wedges in order to hold the ninth, tenth, and eleventh floor package in position when all of a sudden they heard a loud metallic sound followed by rumbling. One of the ironworkers who was installing these wedges at the time looked upwards and observed the slab above him "cracking like ice breaking".

Level of Construction at time of Collapse, (Cuoco, 1992)

Suddenly, the slab fell on to the slab below it, which was unable to support this added weight and in turn fell. The entire structure collapsed, first the west tower and then the east tower, in 5 seconds, only 2.5 seconds longer than it would have taken an object to free fall from that height. Two days of frantic rescue operations revealed that 28 construction workers died in the collapse, making it the worst lift-slab construction accident. Kenneth Shepard was the only one on his crew to survive (Levy and Salvadori, 1992).

http://www.911myths.com/html/progressive_collapse.html

3 Failure Hypothesis

The failure hypothesis was base on two possible factors namely, overloading and instability of components:

1) An overloaded steel angle welded to a shearhead arm channel deformed, causing the jack rod and lifting nut to slip out.

2) The instability of the wedges holding the twelfth floor and roof package caused the collapse.

4 Site Investigation

Journal of Performance of Constructed Facilities, Vol. 6, No. 4, November 1992, pp. 211-231, (doi 10.1061/(ASCE)0887-3828(1992)6:4(211))

The City of Bridgeport's chief consultancy firm at the time of the incident was Thornton-Tomasetti Engineers (T-T). T-T were retained immediately after the collapse to investigate into the cause of this devastating structural failure. T-T were provided with unrestricted access to project documentation, to witness statements, to the collapse site, and to the collapse debris. Throughout the entire rescue operation, team members of T-T were present at the site of the collapse, recording and documenting every movement which took place, as well as preserving as much perishable evidence as possible. This document which I am about to investigate is a compilation of background information, field observations, the results of laboratory tests and computational analyses, and findings concerning the most probable cause of the collapse.

4.1 Eye Witness Reports

Any accounts given by eye witnesses all agreed that the collapse of the building was extremely rapid. Estimates of total collapse ranged from 2 sec to 10 sec. The majority of eye witnesses claimed that the event was first drawn to their attention by a loud bang which appeared to have came from the west building. Most of these witnesses stated that they saw or heard the slabs in the west building collapsed first. The majority of witnesses who had a good vantage point of the collapse believed that the center of the west building was the first element to collapse.

An important account of how the collapse transpired was provided by an ironworker working on the stage IV of the west tower. These men had the unfortunate job of tacking weld wedges underneath the doomed floor package, intended for the ninth, tenth, and eleventh story of the building. Suddenly the claim to have heard a "loud metallic sound followed by r

 

Cite This Work

To export a reference to this article please select a referencing stye below:

Reference Copied to Clipboard.
Reference Copied to Clipboard.
Reference Copied to Clipboard.
Reference Copied to Clipboard.
Reference Copied to Clipboard.
Reference Copied to Clipboard.
Reference Copied to Clipboard.

Related Services

View all

DMCA / Removal Request

If you are the original writer of this essay and no longer wish to have your work published on UKEssays.com then please:

Related Services

Our academic writing and marking services can help you!

Prices from

£124

Approximate costs for:

  • Undergraduate 2:2
  • 1000 words
  • 7 day delivery

Order an Essay

Related Lectures

Study for free with our range of university lecture notes!

Academic Knowledge Logo

Freelance Writing Jobs

Looking for a flexible role?
Do you have a 2:1 degree or higher?

Apply Today!