"E-Solutions" is a new established software development company in the Central district of Hong Kong Special Administrative Region. To provide the best business solutions for local customers, "E-Solutions" form a software development team in 2011, with aided to providing end to end enterprise solutions with ERP or CRM software. The company director hired a project manager, 3 system analysts, 2 software designers, 2 web designers, 10 programmers, 2 test engineers and 1 technical writer. 2 web designers need to development a web-based internet portal for the customer access and download the latest patch or dealing with customer services. A web server will be hosted by "E-Solutions" dedicated for internet portal to introduce the enterprise software products and communicate with customers etc...... In addition, "E-Solution" servicing in different industries including manufacturing, hospitality, government, logistics, sales, R & B and more.

To fulfill the stated requirements and the limited time to develop the system, this project will adopt Dynamic System Development Method (DSDM). By using DSDM, it's quickly and effectively methodology in agile software development.

Aims

The main aim of this project is to develop an internet portal for the software development company to provide online services for end user.

In order to promote the products and services to potential customers, a web-based internet portal is proposed. Guests or customers can register a user account to get the information they need, or enquiry for the products information and functions.

Moreover, customers can download the software update and patch, a discussion board will be develop for the customers to exchange their experiences and problems. And also the products news page shows the popular products and its' functionality. In the technical support page will shows the frequently asked questions and the best business solutions (as known as consulting services).

Key Phrases

"E-Solutions" company with a core software development team total 23 staffs, dedicated a web server for online sales services and advertising, such as discussion board provide a platform for user exchange their experiences and problems, product's introduction the latest products, solutions center provides the business solutions for the potential customers, technical support center provides the software update and patch, the user login page enable user register a account to access the portal. Moreover, Dynamic System Development Method (DSDM), a Microsoft Windows platform, JSP, Tomcat web server and MySQL database used in the development.

Scope

"E-Solutions" online system can let all guests and customers access company information through internet at any time. All these information can directly access through the web browser. Therefore, information will become easy to management and staff can maintain very effectively.

Objectives

1. To improve the company information management effectively and efficiency. Provide the report about the new system which the elements is essential and the solutions for developing in the system, also prepare the feasibility study report to analysis the problems.

Activities: Investigation on the problem; feasibility studies in technical, operational and economical; and suggested solutions.

Deliverables: Feasibility Report. 1000-1500 words.

Schedule: 1 week (Completion Date - 19th Nov 2012)

2. To provide the detailed analysis, design and solution for the new system.

Activities: Analyze the new system by using DSDM methodology and provide the requirements analysis and database design included the class diagram. By use of prototyping skill, its help to approach the expected result above.

Deliverables: Requirements analysis; class diagram in database design. 1000-1500 words.

Schedule: 1 week (Completion Date - 1st Dec 2012)

3. To provide the detailed physical design, such as layout and interface of the system, also including the coding for the new system. The final product will introduce in this section.

Activities: Physical system design such as user interfaces, system development, prototype and security issue.

Deliverables: System GUI and coding. Max. 2000 words.

Schedule: 1 week (Completion Date - 9th Dec, 2012)

4. To provide the implementation strategy for implementing the system and the guide for user to deploy the new system.

Activities: Testing all the modules of the system include prototype; installation; and maintenance plan.

Deliverables: System testing plan, implementation plan, user manual. Max 3000 words.

Schedule: 2 weeks. (Completion Date - 23th Dec, 2012)

5. To provide the system control and evaluation method. Making the conclusion for the system and review the potential of the new system for the future enhancement.

Activities: Evaluating and review the system competitive in the market, lessons learnt and future development of the system.

Deliverables: Conclusion and evaluation report. Max 1500 words.

Schedule: 2 weeks (Completion Date - 15th Jan, 2013 final submission)

Relevance of other courses

The NCC courses including Database Design and Development, System Analysis and Design, Management Business Project and Principle of Web page design will provide relevant sources of material for the project.

Required resources

Resources search in public libraries. Resources search on the Internet. Standard x64/86 PC, Java Server Pages application software, Apache Tomcat, Windows

Initial references

Gavin Powell, "Beginning Database Design", Wiley Publishing Ltd.

Charles S. Wasson, "Systems Analysis, Design and Development - Concepts, Principles, and Practices", Wiley-Interscience.

Susan Fowler & Victor Stanwick "Web Application Design Handbook" Morgan Kaufmann.

MySQL official website: http://dev.mysql.com

Apache official website: http://www.apache.org

Java Web official website: http://www.oracle.com/technetwork/java/javase/overview/index.html

Critical success factors

Good project plan to avoid project failure.

Obtain sufficient knowledge to determine the process of the requirement analysis.

Understand the skill set to design and successful to implement the new system.

Chapter 1

Introduction

Introduction

Company Background

"E-Solutions" is a new established software development company in the Central district of Hong Kong Special Administrative Region. To provide the best business solutions for local customers, "E-Solutions" form a software development team in 2011, with aided to providing end to end enterprise solutions with ERP or CRM software. The company director hired a project manager, 3 system analysts, 2 software designers, 2 web designers, 10 programmers, 2 test engineers and 1 technical writer. 2 web designers need to development a web-based internet portal for the customer access and download the latest patch or dealing with customer services. A web server will be hosted by "E-Solutions" dedicated for internet portal to introduce the enterprise software products and communicate with customers etc...... In addition, "E-Solution" servicing in different industries, including manufacturing, hospitality, government, logistics, sales, R & B and more.

"E-Solutions" decided to develop a web portal dealing with existing customers and guests, and it's a new established software company so they haven't the website now and they also need an integrated system for customer services and products introduction. My department head asked me for this system development project and the director need detailed system development documentation about this project. Therefore, my boss also assigned two more colleagues to help me in this project to reduce my workload.

Project initialization

Our customers also complaint "E-Solutions" still no official website to download patch and software version update. Moreover, some customer updated to the new released of Windows 8 cannot run the program and got some system bugs, it's is directly affecting their business. For this issue, company director known the existing problems and want to implement a new system immediately.

In the new system, we have preliminary gathered some user requirements that the system what core functions will be developed. Guests can visit our home page to get the products information, such as prices and their features, they also able to view the solutions for their business and leave a message to staff asking for any inquiry. In addition, guests and existing customers can register a user account to logon to the system to access more information about the company, for example, buy our system and make an appointment to onsite installation. The main functions of the system are able to publish the new software version and release patches for customer download.

Chapter 2

Literature Review

Introduction

Enterprise portals are very common in the internet. Many well design portals such as Microsoft.com and Oracle.com are available on internet; there are many advantages worth considering improving quality and usability. Moreover, in this section covered the tools and technologies such as programming language and database system in this system development.

Web-interface Database System

The web database system that includes server and client interactions, clients request the website contents through the web browser, web server return and interpreted the data to the clients, most of the e-commerce websites nowadays are using this kind of model. Clients can use any device that connected to the internet with web browser, they can access any information anytime without geographical restrictions, and there are some benefits by using web-interface database system:

Customers can come from anywhere around the world.

Web interface is very user friendly, users can very easy to manage the database through web GUI.

Lower the advertising cost and the brand goodwill can spread very fast in the internet

Customer can buy the products easily, transactions process can be finished online.

It is a globe trends to push up companies to develop internet business

The database driven website that used by "E-Solutions" because users and customers can access the information they need, such as company news and product information. Administrator can manage the database records through the back-end management system, and also can real time processing client's request.

Server side Technology

The web applications development is used Java Server Page (JSP), it is released by Sun Microsystems, it's bring out a lot of benefits to the developers such as free to use and supported by a very large user community. Moreover, The Microsoft Active Server Page (ASP) and PHP is very similar to the JSP, they both are the server side technology, but only the programming language is different, they are designed for produce dynamic web pages with a database system.

Database Management System

The database management system (DBMS) is used MySQL server, it's an open source software free to use and still continuous development by the official community, also its support many programming languages such as PHP, Perl, Python, Ruby, Java, .Net, C# and Visual Basic. Moreover, it's supported with many operating systems such as Microsoft Windows, Linux, Solaris, IBM AIX and Apple Mac OS. By using MySQL server provides many powerful features, its advantages can compares with other enterprise database management software. In addition, it's provides the GUI add-on to the users, it's called MySQL Workbench; this is the reason why I am choosing MySQL Server in this system development.

Chapter 3

Feasibility Report

Introduction

"E-Solutions" is a new established software development company; it's providing business solutions to many different industries in Hong Kong. The existing two workstations are shared to all staff in the company without centralize database for storage, such as customers record and sales record. The currently records just save into Microsoft Excel format and saved in different workstation. For this purpose, many staff complains they need consumed lot of time for searching information and update; the files have missing or corrupt before. As a result, the really need a centralize system for storage company records, all staff can access in same time to increase the efficiency. Moreover, there are two ERP and CRM software released in the past few months, customers request some patch update to fix some system bugs, but there are no channels to publish the resources to customer, so that it is very urgent to implementation of the "E-Solutions" enterprise portal to solve this problem.

In view of this problem, the director held a number of meetings to find out some solutions, many staffs are support to develop a new system to publish resources to customers and deal with any administrative task. For the company long term development, the new system is all pluses no minuses.

There are four sections will summarize the information in the feasibility study and they are:

Fact finding of System Requirements

Fact finding of user Requirements

Technical Feasibility

Economic Feasibility

Schedule Feasibility

Operational Feasibility

Proposed solutions

Also in the feasibility study, the information gathered from general staff, department head, sales manager, customer service manager and system administrator. From 15 Oct 2012 to 6 Nov 2012, we meeting and interviewing the related person to gathering information from them. The feasibility report will be presented and introduced to the "E-Solutions" director on 8 Nov 2012.

Terms of References

Investment budget:

The amount for the whole project including the new system and hardware is around HKD $180,000 and which including of:

System development and design

Database design and development

Computer hardware, software licensing and installation

Network setup and maintenance fee

New system installation and users training

Fact Finding of User Requirements

Expected Results and Benefits

Director

The project successful and meet the schedule of the completion day

The project development not over the estimated budget

The new system can increase company profits

General Staff

New system can improve daily operations

Easy to use and management

Department Head

Less staff complaints about old problems in daily jobs

Sales Manager

Products price record can display in web portal

Reduce customer ask for quotation

Customer Service Manager

New system can handle the low level customer problems

Customer can leave message or question in web portal

System Administrator

Control users account who login to the system

Centralized database easy to management records

Fact Finding of System Requirements

The system developed in JSP and hosted with Apache Tomcat web server in Microsoft Windows platform, the system hardware requirements, networking and proposed solutions suggested for the system.

Centralized database

A centralized database storage "E-Solution" information such as customer information, products information and system login information… …etc.

System interface

The GUI must be simple and user friendly, it can let user familiar with the new system

GUI compatible with most web browser in the market

The interface design meet the HCI principles

Hardware and Networking

Hard disk storage size must be large capacity to store large amount system records

Possible contains fault tolerant of hard disk, suggest mirror RAID for redundancy

Anti-Virus system to protect the system data

Scheduled system data backup provides fast restoration when system failure

Reliability Ethernet link is require to handle large user access during peak hours

Feasibility Study

Technical Feasibility

This project of enterprise portal system development by "E-Solutions" internal web design team, it is a database-driven website designed for internal administration and online customer services. The internal system staffs can accesses all resources in a centralize storage and also they can add, update or delete customer information, publish company news, uploading new release software and patches, update products information and provides the technical and solutions for the potential customer. Moreover, administrator also can login to the back-end management system to update all the records such as lock any users account, reply user enquires, all the records stored into a centralize system for easy query and management.

In addition, this system also provides a message board for guests or register customers and users to leave the messages about the products and services, such as the one-off installation fees or the products quotation. On the other hand, in the technical support center provides software update, patches and tools download is for register customers to accesses these resources, and also the FAQs center, user can query about the problems question and answer. In the user center of the system, user can login to the system for change their account information, such as login password or any contact information; the solutions center provides the best business for the customer such as which system is suitable for their company.

The new system will use Microsoft Windows platform hosting the server side, choose of using Microsoft Windows platform because most user familiar with the friendly GUI and it is a reliable operation system. The DBMS will use MySQL Server to storage system records and install Apache Tomcat as a Web server because Apache Tomcat and MySQL Server both power and open source no need buy any software licenses to use.

Finally, the system will use JSP as the programming language, JSP is a server side processing technology, after server interpreted the user requests, and then return the results and displayed in the user browser, JSP run with HTML, so user just only using a web browser and they can access to the system anytime and anywhere.

Economic Feasibility

Economic feasibility used to evaluate benefits and it's as known as cost-effectiveness analysis. The new system development cost is lower because just a website including a database, if the project failure the lost is just a little bit, so it is no risk in the economic issue, and also the whole project is controlled by internal web design team, it's easy to management. On the other hand, the hardware is another factor in economic feasibility, the cost of hardware cannot be save, you pay for the higher price, you can get the better quality, vice versa.

In addition, the system also bring out a lot of benefits such as running in non-business hours to provides customer services to user and the products can be promote through internet to reduce the advertising cost, internet business also deliver unlimited business opportunities, you difficult to measure the actual of the benefits and advantages from the new system, it is only know the new system is bring out many advantages.

Schedule Feasibility

In the schedule feasibility is to analysis the factors in this system develop period how to avoid its failure, a detailed project planning including in the project proposal, the estimated develop time about 2 months, in the limited of time to successful to complete whole project, a good project plan is very important to avoid takes longer time to complete. In addition, developers can follow the established timeline to fulfill the progress. By follow the schedule, the rates of project failure is reduce and forced to deliver the specify progress.

Operational Feasibility

Operational feasibility is to investigate how a new system to solve the problems. In the initial in the project start, the existing customer really needs a platform to get some services or support, but the company no such system deal with customer services or management customer's information. As a result, including customers or company staffs, they desire the new system to solve the existing problems, the purposed system functions will be based on user requirements.

On the other hand, company portal is very popular in the internet, company website integrated with customer services; the advantages are easier to management customer's information by administrator.

Proposed Solutions

There are two optional plans of the proposed solutions, the detailed comparison based on operational feasibility, technical feasibility and economic feasibility. The most cost-effective plan will be adopted.

Solution Summary

Two solutions summarize as below, they centralized database system and independent database system. The independent database system is separate two database which for internal staff accessed by intranet. Another is the centralized database system combined the intranet database and internet database; all user must set the user level privilege for the account permission to access any resources or data.

Outlines of proposed solution:

Description

Plan X

Plan Y

General description

Independent database system for enterprise portal

System connect to the centralized database

User Interface

Web interface designed in HCI principles

Same as Plan X

Software requirements

- Apache Tomcat Web Server

- Developed in Java Server Pages technology

- Orcale Database

- Microsoft Windows Server

- Apache Tomcat Web Server

- JSP technology for dynamic web content

- MySQL Server Database

- Microsoft Windows OS

Hardware requirements

- At least one database server with reliable storages and schedule backup devices

- Workstation

- Network installation

- Internet Connection

- A powerful computer with reliable storages and backup devices

- Workstation

- Network installation

- Load balancing

- Internet Connection

Schedule

Database and user interface development: 2 months

Software installation: 5 days

Hardware/Network installation and testing: 15 days

Training:2 weeks

Database and user interface development: 3 months

Software installation: 2 days

Hardware/Network installation and testing: 7 days

Training: 2 weeks

Staffing & organization

System Administrator, IT technician staff and hardware/network installation vendor

Same as Plan X

Feasibility analysis schedule

Consider the technical feasibility

Consider the operational feasibility

Consider the economic feasibility

Consider the schedule feasibility

Concerned other legal factors and financial factors

Also consider the financial factors such as budget and available resources

Same as Plan X

Human factors

Staff maybe afraid changes of new system and fear on it.

Same as Plan A

Development method

Web application developed by using HTML and JSP technologies. For example, HTML,CSS,JS and JSP

The database is developed by MySQL Server and compatible with ANSI92

The hardware installation such as network and software are completed by vendor.

Same as Plan A

Cost-benefit analysis

Basic cost: HKD $200,000

Maintenance: HKD $17,000/yr

Benefits:

System performance better, can handle internal and external client request separately

Total monthly cost:

HKD $10,000

Total monthly benefit estimated:

HKD $220,000

Basic cost: HKD $150,000

Maintenance: HKD $12,000/yr

Benefits:

Easy management in one combined database system, so the cost is lower

Total monthly cost:

HKD $ 10,000

Total monthly benefit estimated:

HKD $220,000

Cost

One input: Hardware, software, networking and training cost

Indirect: Internet service, technician support cost and system maintenance fee

Same as Plan X

Benefits

Query data fast and easily

Improve productivity

Customer can download patches and software update thought internet themselves

One system easy to maintain

Query data fast and easily

Improve productivity

- Customer can download patches and software update thought internet themselves

- Use less power, reduce use of electrical

Disadvantages

Two system need maintenance separately

Cannot directly query internet record

Used more power so may increasing use of electrical

User training is needed to use for new system

Data and records are rapidly growth

Database structure complex is hard for maintenance

Recommendation and Conclusion:

After the comparison of two plans both are similar, but the plan X is higher cost and plan Y is lower cost. Moreover, plan Y let staff can cross over to query both intranet and internet record easily, and plan X is vice versa. Both system can further development in the future such as internet purchase the products, but the security issue is hard to guarantee the payment is secure, so this need a lot of time for study and solve this problem. By using the centralized database system, user account login to the system can set the privileged level for access resources; it makes convenience for the staff can cross over to query internet and intranet database records. The new system also can reduce the staff workload and increase productivity, for the company long term development is an advantage. Finally, the suggestion in plan Y is the best solution for the development in the enterprise portal.

Chapter 4

Critical Analysis on Existing System

Current System Overview

No internet portal for customer

Customers always complaint about our products need to release some patches or software update to fix the bugs and publish in website or ftp. After our products released, it was found the software update is needed, and in the existing problem is no platform to announce any news or resources download for customer.

No centralize database for staff

Currently, internal staffs still no any database to store the sales records and customer records, such records just saved into two workstations as a file server to share with all staffs. And also, the records just saved in Microsoft Excel or Word format, it is not designed for multi user real time process, staffs cannot access and amend in a file of same time, but if they can complete the operation, sometime they report some files have corrupted and failed to fix.

Hardware Environment

In the company, currently does not have a system help for administration, all the records just entered into the Microsoft Excel or Word format and saved to two file servers, all staffs have their personal computer for operations, but by the company policy that staffs are strictly prohibited to store any sensitive company information such as customer information or sales information into personal computer, so the company's information stored in two shared file server only. As a result, staffs report the problem to their department head, but they cannot got any solution to solve this problem.

Current System Problem

Information scattered and non-centralized

As mentioned the company records stored into two different file server, no specify staff to sort out the categories which type of data store in which file server. This is a problem staff also very difficult to search their information, and need consume a lot of time in playing "hide and seek".

Lack of Internet connection of computer

By the company policy, general staff computer cannot access to the internet, only the department heads have the right of the internet access because this action can avoid the company sensitive data leakage. For this action, company provided four computers that they connected to the internet, but the all general staff to shared four computers to daily operation, they also complaints about failed to book for use the four computers to do their job in whole day, and sometime they need over time work to complete their job.

Loss of data consistency

The missing data also occurred in company, there are no standard guideline to the staff, which kind of file store to which file server. They also access to file server A and saved a copy to file server B, between two file servers is not synchronize. Some staffs accessed to the old file and saved the newest data onto it, the critical problem is here.

Environmental pollution

The staffs always over time working indirect consequence to environmental pollution because over used the electrical and air conditioner caused light pollution and air pollution. Ozonosphere is slowly erode because human activities such as nitrous oxide emissions.

Chapter 5

Requirement Analysis

Introduction

In the stage of the requirement analysis is to identify what is the functions are the system included, there are two section to investigate on the system requirements and they are functional requirement and non-functional requirement. The functional requirement is the basic functions that meet the target user needs. Besides, the non-functional requirement is the estimated the extra functions that is not essential to develop, in most case of the software project, if the time is allow, non-functional requirement may develop for the user.

Project Assumptions

The project assumptions below is to ensure the system implementation smoothly and successful and these rules should be fulfilled, the project plan schedule developed and just follow the time table to deliverables any task. Any changes of below rules may cause the project failure, so we need to very carefully to meets all the requirements below.

Scope of the System

The scope of the system can let all guests and customers access our company information through internet at any time. All these information can directly access through the web browser. Therefore, information will become easy to management and staff can maintain very effectively. The main functions must developed are user login, products information, technical support center, FAQs zone and message board.

The goal of the project in the enterprise portal is design a back end system for the staff and administrator to operate customer services online, this can reduce the human resources of deal with customers and to enhance the efficiency and production. The main functions for the staff must developed are disable user account, add, change, or delete the products details, answer the question in the message board and handle any other customer enquires in the system.

Budget and Resources

In the whole project of the system development, the department head keep track the project progress and ensure any development stages meet the development schedule. In addition, in the requirements analysis stage will collects the fact findings and functional requirements and non-functional requirements from the staffs and customers. However, after the prototype is ready, the acceptance test and user training will provides for the user, director responsibility to monitoring and controls the project budget, if over the limited budget, director need to give any advice for the development team and approves for the extra budget. The feasibility report stated the estimated budget and the proposed hardware solutions.

Expected Delivery Date

The project is started from 12 November 2012 and the completion date of the project is scheduled in January 2013. Besides, the detailed project schedule can be referred to the project proposal, any defer is not allowed.

Functional Requirement

Overview

The enterprise portal structure contains two major parts of the system and they are:

Front end system for customer or guest

Back end system for administrator

Target Users

The "E-Solution" portal main aims is to promote or advertising the products and also provides latest patch or software update to customer. Guest do not required to login for the system access, they can browse the homepage to view the product information and services, once they are becomes customer, their company information will update to the database, they can register a user account in the system to get more support from "E-Solution". The system suitable for people who want to:

Browse products information

Download latest patches and software update

Get technical Support

The table below shown the functional requirement of the system, there are two core parts, each part includes many modules and functions, the system will achieve the below stated functions.

Front End System

Function Name

Function Details

User Center

User registration

User login

Modify account details

Products Center

Display the products and their category

Technical Support Center

Patches download and software update

Tools download

Frequently Asked Questions

Solutions Center

Shows the detailed information of business solutions

Message Board

Leave a message

View messages

Back End System (Administrator Console)

Function Name

Function Details Summary

User Management

Grant permission to user

Lock and unlock user account

Search User

Query user by criteria

User Avatar Management

Upload new avatar

Delete avatar

Notice Management

Add, modify or delete notice

News Management

Add or delete news

Partner Sites Link Management

Add, modify or delete partner sites link

Software Category Management

Add, modify or delete software category

Software and Resource Management

Add, modify or delete software and resource

Solutions Management

Add, modify or delete solution

Frequently Asked Questions Management

Add or delete frequently asked questions

Message Board Management

Reply or delete user message

Tools And Patches Download Management

Add, modify or delete tools and patches for download

Non-Functional Requirement

The project is about develop an enterprise image web portal for customer access and download information. In the project initializing, the online order and payment are consider to develop of the system function, but based on the security issues, it's difficult to solve this problem to protect customer sensitive data and guarantee such information not leakage or stolen by someone. Moreover, the GUI designed user friendly, simple and easy to use, the database must very secure and reliable to keep the system information, also the scheduled backup job is very important, if there are any disaster of data loss, a copy of the backup can quickly resume the service as soon as possible. The stated requirements above is to ensure the system reliability, increase the security and usability.

System Specification

In this section shows the detailed program specifications view of the screen input and output, there are seven criteria described as below and they are program module, program name, program type, table input/output, screen input/output and description.

Program Module : Create Member Account

Program Name : User registration

Program Type : Online

Table I/O : User

Screen I/O : User Registration Screen

Description : It allows user register an account

Program Module : Management User Account

Program Name : User management

Program Type : Online

Table I/O : User

Screen I/O : User management screen

Description : It allows administrator grant user account permission or disable a user account

Program Module : User Query

Program Name : User Search

Program Type : Online

Table I/O : User

Screen I/O : User query screen

Description : It allows administrator query users account by selected criteria

Program Module : Add New Avatar

Program Name : User avatar management

Program Type : Online

Table I/O : ICO

Screen I/O : User avatar management screen

Description : It allows administrator to upload avatars for user registration

Program Module : Delete Avatar

Program Name : User avatar management

Program Type : Online

Table I/O : ICO

Screen I/O : User avatar management screen

Description : It allows administrator delete avatars from database

Program Module : Add Notice Information

Program Name : Notice Management

Program Type : Online

Table I/O : AFFICHE

Screen I/O : Notice management screen

Description : It allows administrator add notice information

Program Module : Modify Notice Information

Program Name : Notice Management

Program Type : Online

Table I/O : AFFICHE

Screen I/O : Notice management screen

Description : It allows administrator modify notice information

Program Module : Delete Notice Information

Program Name : Notice Management

Program Type : Online

Table I/O : AFFICHE

Screen I/O : Notice management screen

Description : It allows administrator delete notice information

Program Module : Add News Information

Program Name : News Management

Program Type : Online

Table I/O : NEW

Screen I/O : News management screen

Description : It allows administrator add news information

Program Module : Delete News Information

Program Name : News Management

Program Type : Online

Table I/O : NEW

Screen I/O : News management screen

Description : It allows administrator delete news information

Program Module : Add Partner Sites Link

Program Name : Partner sites link management

Program Type : Online

Table I/O : LINK

Screen I/O : Partner sites link management screen

Description : It allows administrator add partner sites link information

Program Module : Modify Partner Sites Link

Program Name : Partner sites link management

Program Type : Online

Table I/O : LINK

Screen I/O : Partner sites link management screen

Description : It allows administrator modify partner sites link information

Program Module : Delete Partner Sites Link

Program Name : Partner sites link management

Program Type : Online

Table I/O : LINK

Screen I/O : Partner sites link management screen

Description : It allows administrator delete partner sites link information

Program Module : Add Software Category

Program Name : Software category management

Program Type : Online

Table I/O : SSORT

Screen I/O : Software category management screen

Description : It allows administrator add a software category

Program Module : Modify Software Category

Program Name : Software category management

Program Type : Online

Table I/O : SSORT

Screen I/O : Software category management screen

Description : It allows administrator modify a software category

Program Module : Delete Software Category

Program Name : Software category management

Program Type : Online

Table I/O : SSORT

Screen I/O : Software category management screen

Description : It allows administrator delete a software category

Program Module : Add new software and resource

Program Name : Software and resource management

Program Type : Online

Table I/O : SOFT

Screen I/O : Software and resource management screen

Description : It allows administrator add new software and resource

Program Module : Modify software and resource

Program Name : Software and resource management

Program Type : Online

Table I/O : SOFT

Screen I/O : Software and resource management screen

Description : It allows administrator modify software and resource

Program Module : Delete software and resource

Program Name : Software and resource management

Program Type : Online

Table I/O : SOFT

Screen I/O : Software and resource management screen

Description : It allows administrator delete software and resource

Program Module : Add New Solutions

Program Name : Solutions management

Program Type : Online

Table I/O : RESOLVENT

Screen I/O : Solutions management screen

Description : It allows administrator add new solutions

Program Module : Modify Solutions

Program Name : Solutions management

Program Type : Online

Table I/O : RESOLVENT

Screen I/O : Solutions management screen

Description : It allows administrator modify solutions

Program Module : Delete Solutions

Program Name : Solutions management

Program Type : Online

Table I/O : RESOLVENT

Screen I/O : Solutions management screen

Description : It allows administrator delete solutions

Program Module : Add Frequently Asked Questions

Program Name : Frequently asked questions management

Program Type : Online

Table I/O : QUESTION

Screen I/O : Frequently asked question management screen

Description : It allows administrator add frequently asked questions

Program Module : Delete Frequently Asked Questions

Program Name : Frequently asked questions management

Program Type : Online

Table I/O : QUESTION

Screen I/O : Frequently asked question management screen

Description : It allows administrator delete frequently asked questions

Program Module : Reply Message

Program Name : Message Board Management

Program Type : Online

Table I/O : GUESTBOARD

Screen I/O : Message board management screen

Description : It allows administrator reply message

Program Module : Delete Message

Program Name : Message Board Management

Program Type : Online

Table I/O : GUESTBOARD

Screen I/O : Message board management screen

Description : It allows administrator delete message

Program Module : Add Tools and Patches for Download

Program Name : Tools and Patches Download Management

Program Type : Online

Table I/O : MEND

Screen I/O : Tools and patches download management screen

Description : It allows administrator add tools and patches

Program Module : Modify Tools and Patches for Download

Program Name : Tools and Patches Download Management

Program Type : Online

Table I/O : MEND

Screen I/O : Tools and patches download management screen

Description : It allows administrator modify tools and patches

Program Module : Delete Tools and Patches for Download

Program Name : Tools and Patches Download Management

Program Type : Online

Table I/O : MEND

Screen I/O : Tools and patches download management screen

Description : It allows administrator delete tools and patches

Writing Services

Essay Writing
Service

Find out how the very best essay writing service can help you accomplish more and achieve higher marks today.

Assignment Writing Service

From complicated assignments to tricky tasks, our experts can tackle virtually any question thrown at them.

Dissertation Writing Service

A dissertation (also known as a thesis or research project) is probably the most important piece of work for any student! From full dissertations to individual chapters, we’re on hand to support you.

Coursework Writing Service

Our expert qualified writers can help you get your coursework right first time, every time.

Dissertation Proposal Service

The first step to completing a dissertation is to create a proposal that talks about what you wish to do. Our experts can design suitable methodologies - perfect to help you get started with a dissertation.

Report Writing
Service

Reports for any audience. Perfectly structured, professionally written, and tailored to suit your exact requirements.

Essay Skeleton Answer Service

If you’re just looking for some help to get started on an essay, our outline service provides you with a perfect essay plan.

Marking & Proofreading Service

Not sure if your work is hitting the mark? Struggling to get feedback from your lecturer? Our premium marking service was created just for you - get the feedback you deserve now.

Exam Revision
Service

Exams can be one of the most stressful experiences you’ll ever have! Revision is key, and we’re here to help. With custom created revision notes and exam answers, you’ll never feel underprepared again.